Institutional quality begins with repeatable, measurable standards.

Umoja evaluates each asset across space, safety, sanitation, operating efficiency and local compliance—then applies a common operating framework without treating one national template as a substitute for local approvals.

Space that supports affordability without compromising dignity or operations.

NITI Aayog’s SAFE modelling uses approximately 80 sq ft per worker across living and shared areas, within a broader 75–100 sq ft design range. Umoja uses 100 sq ft per Member as a portfolio-footprint convention—not as a substitute for measured built-up area.

Property diligence distinguishes sleeping space, circulation, sanitation, common facilities and non-residential operating areas. Maximum Member capacity is set asset by asset and remains subject to approvals.

NITI Aayog SAFE Accommodation ↗
Fire-safety equipment and lockable utility storage at an operating property
Property standard · safety and utility infrastructure
FrameworkRole in diligenceWhat is tested
SAFE AccommodationNational policy and economic frameworkSite adjacency, space economics, zoning reform and affordability
National Building CodeBuilding-safety referenceOccupancy, fire safety, egress, ventilation, headroom and services
Occupational and labour rulesWorker-welfare baseline where applicableSleeping space, sanitation, water, first aid and gender-separated facilities
State and local regulationsBinding project constraintsUse, FAR/FSI, ground coverage, height, setbacks, parking and approvals

Applicable requirements vary by property, use and state. Final compliance is established through project-specific legal, architectural and fire-safety diligence.

Quality beyond the legal minimum.

Safety and security

Clear egress, fire systems, appropriate lighting, CCTV, on-site supervision and controlled access.

Women’s accommodation

Separate secure blocks, controlled entry and operating protocols designed for safety and uptake.

Sanitation and water

Adequate toilets, bathing, washbasins, drinking water, laundry and waste management for approved capacity.

Durable operations

Cleanable finishes, lockable storage, climate-appropriate ventilation and maintenance access.

Shared infrastructure

Dining, recreation, digital access and first-aid provision where property scale supports them.

Dedicated Member allocation

Each Member has an allocated Nest; high-density layouts are tested for safety and hygiene.

Density must follow approvals and operating economics.

The SAFE report recommends mixed-use or permitted-use reform in industrial areas, more efficient FAR/FSI, rational parking and the ability to construct at least five floors where appropriate. It also recommends residential treatment for utilities and property taxes.

These are reform recommendations. Umoja does not assume that every market permits G+4 development or a particular ground-coverage ratio. Existing approvals and local development-control rules govern each acquisition.

Standardisation may extend to construction—when the asset case requires it.

Light-gauge steel framing

Factory-made galvanised steel framing suited to repeatable low- and medium-rise construction, subject to structural, fire and acoustic design.

Hybrid LGSF systems

Steel framing combined with lightweight or precast infill where permanence, acoustics or local execution favour a hybrid.

Volumetric modular

Factory-built occupancy modules for fast, typically lower-rise deployment where transport and crane logistics work.

Panelised temporary systems

PUF or sandwich-panel systems for temporary requirements; generally less aligned with permanent institutional assets.

Precast concrete

Repeatable permanent components with strong scale economics where volumes and supplier capability justify them.

Technology reference: BMTPC Compendium of Emerging Technologies.

Speed alone does not make a system investable.

Installed cost per approved MemberPlanning, fire and structural approvalsAcoustic and thermal performanceTransport and local supplier capabilityFifteen-to-twenty-year maintenance profileTime-to-occupancy and resulting cash-flow impact

The initial Umoja mandate prioritises running, income-producing properties. Construction systems are evaluated for specific upgrades or future projects and are not required for the base investment case. See how the standard connects to investment discipline and Nia’s operating framework.

Review the asset standard behind the mandate.

Request a discussion →